This product requires a service every 6 months to ensure it continues to operate safely and efficiently. Regular servicing helps maintain performance, prevent issues, and extend the lifespan of your equipment.

Service Interval Reminder

This product requires a service every 6 months to ensure it continues to operate safely and efficiently. Regular servicing helps maintain performance, prevent issues, and extend the lifespan of your equipment.

Pewag PLEW Eta Winner Profilift Weld-On Lifting Point – 1.5-19t WLL

PEW-WP-PLEW

Pewag PLEW Eta Winner Profilift weld-on lifting point with 1.5-19t WLL for permanent lifting applications. High-tensile steel construction with integrated positioning spring, marked inclination angles and individual serial numbering.

From: £18.30£21.96 Exc VATInc VAT

If you would like to request a change to this product that isn’t available within the current options, please enter your requirements here. Any modifications will need to be processed through our quote system rather than purchased directly online.

Add to Quote

Description

Pewag PLEW Eta Winner Profilift Weld-On Lifting Point – Permanent High-Strength Lifting Solution for Industrial Fabrications

The Pewag PLEW Eta Winner Profilift Weld-On Lifting Point is a premium permanent lifting solution engineered for demanding industrial applications where bolted lifting points are impractical or unsuitable. Designed to be welded directly onto steel fabrications, heavy machinery, transport equipment, structural components, and vehicle bodies, the PLEW Eta combines exceptional strength, durability, and operational safety for professional lifting environments.

Manufactured from high-tensile alloy steel, the PLEW Eta delivers higher working load capacities than the standard Pewag PLE/N range while allowing increased loading in the preferred direction of pull, as specified within the manufacturer’s operating instructions. Its robust construction and permanent installation make it an ideal lifting point for applications involving repeated lifting, repositioning, assembly, transportation, and lashing of heavy components.

Designed and manufactured to Pewag’s renowned engineering standards, every lifting point is individually serial numbered for complete traceability and is supplied with comprehensive welding instructions and user documentation to ensure safe installation and long-term reliability.

Permanent Weld-On Design for Maximum Strength

Unlike removable lifting eye bolts, the PLEW Eta is permanently welded onto the load, creating a secure lifting point that becomes an integral part of the structure.

Typical installation applications include:

  • Steel fabrications
  • Heavy machinery
  • Industrial process equipment
  • Vehicle chassis and bodies
  • Plant and construction equipment
  • Offshore support structures
  • Modular assemblies
  • Mining and quarry equipment

Its permanent installation eliminates the need for threaded fixing points while providing a durable lifting solution for repetitive lifting operations.

Integrated Spring Mechanism for Easier Handling

A distinctive feature of the PLEW Eta is its integrated positioning spring.

The spring mechanism helps keep the lifting ring in the desired position during:

  • Welding installation
  • Sling attachment
  • Rigging operations
  • Load positioning
  • General handling

For larger models, the spring primarily assists accurate positioning during welding, making installation easier while helping prevent uncontrolled movement of the lifting ring.

Designed for Safe Multi-Directional Lifting

The PLEW Eta is engineered to accommodate a wide range of lifting configurations while helping operators identify safe loading directions quickly.

Safety features include:

  • Clearly marked 45° and 60° inclination grooves
  • Suitable for single-leg lifting
  • Compatible with multi-leg sling assemblies
  • Supports asymmetric lifting applications
  • Increased loading capability in preferred pull direction
  • Clearly defined working load limits for different lifting configurations

These visual indicators help reduce the risk of incorrect rigging and improve lifting safety on site.

Heavy-Duty Construction with Complete Traceability

Every Pewag PLEW Eta lifting point is manufactured from premium high-tensile steel for maximum durability in demanding industrial environments.

Construction benefits include:

  • High-strength alloy steel body
  • Permanent weld-on bracket
  • Individual serial number for full traceability
  • Optional peTAG digital asset identification
  • Corrosion-resistant industrial finish
  • Designed for long service life under repeated loading

Each lifting point is individually packaged with detailed installation guidance to support safe commissioning.

Typical Applications

The Pewag PLEW Eta is widely used throughout heavy industry, including:

  • Steel fabrication
  • Heavy engineering
  • Manufacturing plants
  • Construction equipment
  • Vehicle body manufacturing
  • Transport equipment
  • Offshore support structures
  • Plant maintenance
  • Mining operations
  • Industrial lifting and lashing applications

Its permanent design makes it particularly suitable where dedicated lifting points are required throughout the service life of the equipment.

Technical information

Weight N/A
WLL

1.5t, 2.5t, 4t, 6.7t, 10t, 19t

Key Features

  • Working Load Limits from 1.5 to 19 tonnes
  • Permanent weld-on lifting point
  • Manufactured from high-tensile alloy steel
  • Higher load capacity than standard PLE/N models
  • Increased loading capability in preferred pull direction
  • Integrated spring-assisted lifting ring
  • Clearly marked 45° and 60° inclination indicators
  • Suitable for single-leg, multi-leg and asymmetric lifting
  • Individual serial number for full traceability
  • Optional peTAG asset identification available
  • Supplied with comprehensive welding instructions
  • Welding to DIN EN ISO 14341 requirements
  • Installation by certified welders to EN ISO 9606-1
  • Ideal for heavy industrial and fabrication applications

Safety & User Instructions

  • Welding must only be carried out by a qualified welder certified to EN ISO 9606-1.
  • Follow the supplied welding instructions in accordance with DIN EN ISO 14341.
  • Ensure the lifting point is welded to a suitable load-bearing structure capable of supporting the intended load.
  • Always observe the permitted direction of pull and marked inclination angles.
  • Never exceed the stated Working Load Limit (WLL) for the lifting configuration being used.
  • Do not allow the lifting ring to bear against sharp edges or rest directly on the load.
  • Inspect the lifting point, lifting ring, and welds regularly for cracks, deformation, corrosion, or other signs of damage.
  • Remove the lifting point from service if defects are identified until inspected or repaired by a competent person.
  • Refer to the manufacturer’s user manual for complete load tables, installation guidance, and inspection requirements.

More from

Products related to

Best selling related products